Reverse osmosis project of a A-share listed enterprise in Qinghai-CASES-反渗透阻垢剂,循环水处理,污水除垢,缓蚀阻垢剂RO膜工厂现货循环水处理山东银河集团9873CM新材料有限公司
  • Reverse osmosis project of a A-share listed enterprise in QinghaiReturn


    Project Name: reverse osmosis operation guarantee project of a A-share listed enterprise in Qinghai

    Project process: heating + stack filtration + ultrafiltration + primary reverse osmosis + secondary reverse osmosis + EDI

    Water yield: 4000m 3/ h

    Water source: groundwater

    Service time: since 2013


    System operating conditions

    Dosing scheme:


    Chemical name

    model

    dosage(mg/l)

    Dosing mode

    Reverse osmosis scale inhibitor 8x concentrate

    GL-8000

    0.25

    Continuous dosing

    Non oxidizing bactericide

    GL-RO180

    5

    Reverse osmosis acid cleaning agent

    GL-132

    5%

    Dosing during cleaning

    Reverse osmosis alkaline cleaning agent

    GL-131

    5%

     

    RO system operation data:


    date

    Pressure(MPa)

    Flow(m3/h)

    Conductivity(μs/cm)

    Desalination rate%

    Recovery%

    Water temperature℃

    inlet

    Inter segment

    Concentrated water

    Water production

    Concentrated water

    inlet

    Water production

    2013.7

    1.0

    0.80

    0.90

    130

    43

    1100

    11

    99

    75

    25

    2022.1

    1.1

    0.90

    0.90

    120

    40

    1000

    50

    95

    75

    21


    Project operation effect

    The desalted water system of the power plant is the largest desalted water treatment system in the whole northwest, with a treatment water volume of 1800 tons per hour. The system has been operated by our company since it was put into operation in 2013. After years of mature operation and management experience and excellent pharmaceutical quality, our company has continuously and stably produced up to standard water for the whole magnesium Industrial Park for many years, ensuring the safe, stable, long, full and excellent operation of the production plant. After nearly ten years of operation, ultrafiltration, reverse osmosis and EDI equipment are basically not replaced, which saves a lot of membrane replacement and daily operation and maintenance costs for the workshop.


    Real scene of the project site

    1652336766923823.jpg


    1652336784146338.jpg


    Pre:China Coal jiuxin coking wastewater treatment and transportation guarantee project
    Next:Shaanxi Huadian coal mine evaporative crystallization system project
    Share to:
    Shandong Great Lakes New Material Co., Ltd.   鲁ICP备82599606号-1
    银河集团9873CM